Project Intake
Set up one property cleanly, then move into room-by-room mockup generation and report packaging.
Step 1
Step 2
Step 3
Step 4
Required
0 uploaded
Optional
Step 5
Project record
Saved locally with the property details and client context.
Room setup
Required rooms plus any optional room with a photo.
Concept tracks
Option A, B, and C are prepared before mockups are generated.
Report draft
Version 1 is created and ready for the workflow hub.